0
May 24, 2013 Posted by admin in bikes

Detroit Bikes: Factory Build 1

I will be posting some photos of the progress at Detroits only bicycle factory (Detroit Bikes) as the factory sets up for July production.

Setting up the wash room (not bathroom) this is where steel tubes and other various parts get cleaned and prepared for final welding.  attached to these post will be a trolly system suspended 9 feet above that will transfer baskets from one 90 gallon wash tank to another 4 in total.  More photos to follow.

 
Detroit Bikes paint prep and steel prep room

Detroit Bikes paint prep and steel prep room